We designed bespoke fixing details to modulise and pre-fit the facade screens to the primary building structure before it was craned into place, to remove the need for external access equipment. We also researched alternative materials to reduce costs.
We met the client's budget by sourcing and developing cost-saving alternative products, while retaining architectural intent.
The contractor's goal of eliminating any access requirements from the outside was also met, by our pre-fit approach to installation.
Our design methodology allowed us to pre-fabricate components and avoid delays despite a tight, and at times spasmodic, schedule.